抽象的な

An integrated three-dimensional model on financing risk evaluation for PPP power plant projects based on WSR

Li Ping, Bai Bing


This article starts from the risky factors that influence the smooth running of PPP power plant project financing, such as insufficient income, changes in interest rates and so on. On the basis of previous studies, we develop an integrated three-dimensional model for financing risk evaluation of PPP power plant projects based on the WSR systems methodology, so that its "past", "present" and "future" are organically combined. Verifications in case studies show that this model effectively solves the evaluation problems for PPP financing risk and it can make risk control better.


インデックス付き

  • キャス
  • Google スカラー
  • Jゲートを開く
  • 中国国家知識基盤 (CNKI)
  • サイテファクター
  • コスモスIF
  • 研究ジャーナル索引作成ディレクトリ (DRJI)
  • 秘密検索エンジン研究所
  • 学術論文インパクトファクター (SAJI))
  • ICMJE

もっと見る

ジャーナルISSN

ジャーナル h-インデックス

Flyer

オープンアクセスジャーナル